Concrete Contractor License Requirements by State

Forms, pours, finishes, and repairs concrete flatwork, foundations, paving, and related systems. This page compares concrete contractor licensing requirements across all 50 US states and the District of Columbia. Every row links to the verified state page with statute citations, fees, exam scope, insurance, and renewal rules.

Published guides
51
Exam pathways recorded
7
Require surety bond
6
Local / scope-specific
29
Avg published experience
3.3 yr

Comparison table — all 51 jurisdictions

Scroll horizontally on smaller screens. Use the sort control to compare low-fee states, high-bond states, or the jurisdictions with the heaviest published experience requirements. Click any state to open the verified license page.

29 of these published jurisdictions have no single statewide trade license; local and scope-specific rules may apply.

StateLicenseExamExperienceBondInitial feeRenewalNASCLATime
Alabama

Local / scope-specific

Alabama Concrete Contractor — No Standalone State Concrete LicenseConfirm with authority——$3001 yr—ALBGC and Home Builders processing
Alaska

State registration

Alaska Concrete Contractor — Specialty Contractor Registration — Concrete and Paving ContractorNo statewide exam—$10,000$2502 yr—DCBPL does not publish a universal processing time.
Arizona

Mixed / scope-dependent

Arizona Concrete Contractor License — Arizona Registrar of Contractors (C-9 / R-9 / CR-9)Required4 yr$4,250$3802 yr——
Arkansas

State license

Arkansas Concrete Contractor — Commercial / Residential Concrete Classification PathConfirm with authority———1 yr—Board/Committee application
California

Mixed / scope-dependent

California Class C-8 — Concrete ContractorRequired4 yr$25,000$2002 yr—CSLB does not publish a fixed processing time
Colorado

Local / scope-specific

Colorado Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————Local authority processing time controls.
Connecticut

Local / scope-specific

Connecticut Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam——$1201 yr—DCP registration and local permit timing are separate.
Delaware

Local / scope-specific

Delaware Concrete Contractor — Statewide Registration / No Separate Concrete ClassificationNo statewide exam——$2001 yr—Apply before performing construction or maintenance work
District of Columbia

Local / scope-specific

District of Columbia Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam——$992 yr—DLCP licensing and DOB permit review have separate timelines.
Florida

State license

Florida Concrete Work — No General Statewide Concrete ClassificationConfirm with authority——————
Georgia

Local / scope-specific

Georgia Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————There is no statewide concrete-specialty license timeline
Hawaii

State license

Hawaii C-31a Cement Concrete Contractor — DCCA Contractors License BoardConfirm with authority4 yr—$2602 yr—Timing depends on Board approval
Idaho

Local / scope-specific

Idaho Concrete Contractor Registration — No Separate Concrete LicenseConfirm with authority——————
Illinois

Local / scope-specific

Illinois Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————Local authority processing time controls.
Indiana

Local / scope-specific

Indiana Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————Local authority processing time controls.
Iowa

Mixed / scope-dependent

Iowa Concrete Contractor — Statewide Registration / No Separate Concrete ClassificationNo statewide exam—$25,000$501 yr—DIAL issues registration after the complete application requirements are met
Kansas

Local / scope-specific

Kansas Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————Local authority processing time controls.
Kentucky

Local / scope-specific

Kentucky Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————There is no statewide concrete credential timeline
Louisiana

State license

Louisiana Concrete Contractor — Concrete Construction / Related LSLBC ClassificationsDepends on pathway——$1001 yr—LSLBC does not publish a universal processing time for this classification
Maine

Local / scope-specific

Maine Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————No statewide concrete credential is issued.
Maryland

Mixed / scope-dependent

Maryland Concrete Contractor — MHIC for Existing Residential Work / No Separate State Commercial Concrete LicenseRequired2 yr—$403.752 yr—Allow time for examination
Massachusetts

Local / scope-specific

Massachusetts Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam——$1502 yr—HIC and CSL timelines are separate; use the current state application systems.
Michigan

State license

Michigan Concrete Contractor — Residential Maintenance & Alteration Contractor — Concrete TradeRequired———3 yr—Depends on course completion
Minnesota

Local / scope-specific

Minnesota Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————No standalone concrete credential is issued.
Mississippi

State license

Mississippi Concrete Contractor — MSBOC Concrete / Concrete Paving Specialty ClassificationsRequired———1 yr——
Missouri

Local / scope-specific

Missouri Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————No statewide concrete credential is issued.
Montana

Local / scope-specific

Montana Construction Contractor License — No Separate Concrete ClassificationNo statewide exam———1 yr—DLI does not publish a universal CCL processing time.
Nebraska

Local / scope-specific

Nebraska Concrete Contractor — Statewide Registration / No Separate Concrete ClassificationNo statewide exam——$401 yr—NDOL does not publish a universal registration timeline.
Nevada

State license

Nevada C-5 Concrete Contracting LicenseConfirm with authority4 yr—$6002 yr—NSCB does not publish a single C-5 issuance timeline
New Hampshire

Local / scope-specific

New Hampshire Concrete Contractor — No Standalone State Concrete LicenseNo statewide exam—————No statewide concrete credential is issued.
New Jersey

Mixed / scope-dependent

New Jersey Concrete Contractor — HICB for Covered Existing Residential WorkNo statewide exam—$10,000$1101 yr—The Division does not publish a universal processing time
New Mexico

State license

New Mexico GS-4 Concrete, Cement, Walkways and Driveways — CIDRequired2 yr$10,000$1563 yr—CID does not publish a standard GS-4 processing time
New York

Local / scope-specific

New York Concrete Contractor — Local Licensing FrameworkConfirm with authority——————
North Carolina

State license

North Carolina Concrete Construction — NCLBGC Classification PathConfirm with authority——————
North Dakota

Local / scope-specific

North Dakota Concrete Contractor License — Secretary of StateConfirm with authority——————
Ohio

Local / scope-specific

Ohio Concrete Contractor — Local Licensing FrameworkConfirm with authority——————
Oklahoma

Local / scope-specific

Oklahoma Concrete Contractor — Local Licensing FrameworkConfirm with authority——————
Oregon

State license

Oregon Construction Contractor License — No Separate Concrete ClassificationConfirm with authority——————
Pennsylvania

Local / scope-specific

Pennsylvania Concrete Contractor — HIC / Local FrameworkConfirm with authority——————
Rhode Island

Local / scope-specific

Rhode Island Concrete Contractor RegistrationConfirm with authority——————
South Carolina

State license

South Carolina Concrete / Concrete Paving Contractor — SCLLRConfirm with authority——————
South Dakota

Local / scope-specific

South Dakota Concrete Contractor — Contractor’s Excise Tax LicenseConfirm with authority——————
Tennessee

State license

Tennessee Concrete Contractor — Classification and Monetary-Limit PathConfirm with authority——————
Texas

Local / scope-specific

Texas Concrete Contractor — Local Licensing FrameworkConfirm with authority——————
Utah

State license

Utah S260 Asphalt & Concrete Contractor — Division of Professional LicensingNo statewide exam———2 yr—DOPL does not publish a universal specialty-contractor processing time
Vermont

State license

Vermont Residential Concrete Contractor Registration — No Separate Concrete LicenseConfirm with authority——————
Virginia

State license

Virginia CEM Concrete Contracting — DPOR Board for ContractorsConfirm with authority——————
Washington

Local / scope-specific

Washington Concrete Specialty Contractor RegistrationConfirm with authority——————
West Virginia

State license

West Virginia Concrete Contractor ClassificationConfirm with authority——————
Wisconsin

Local / scope-specific

Wisconsin Concrete Contractor — Dwelling Contractor / Local FrameworkConfirm with authority——————
Wyoming

Local / scope-specific

Wyoming Concrete Contractor — Local Licensing FrameworkConfirm with authority——————

National picture for concrete contractor

Of the 51 jurisdictions currently published in this dataset, 7 record required or conditional examination pathways, 6 record a positive license-bond amount, and 0 record NASCLA acceptance. Among entries with a positive numeric experience threshold, the average recorded value is 3.3 years.

The comparison above is generated at build time directly from the state license entries on this site. Every value is traceable to the regulator's published rule. If you spot a discrepancy, the state page is the source of truth and will be re-verified against the official source set.

Choosing where to license first

Related trades

Scope of work overlaps at the edges of every classification. Contractors researching concrete contractor licensing often also need the comparison hub for these adjacent trades:

Local requirements and practical guides

Related reading

Original cross-state analyses from our dataset that add context to the concrete contractor table above — who runs the exams, where the burden is heaviest, and what a criminal record means for eligibility.

Data is sourced from the issuing boards' published rules. Latest completed source-check date represented in the dataset: 2026-09-30.