New Mexico Concrete Contractor License Requirements (2026)
By Gabriel Giner, Editor · Source checked 2026-09-08
New Mexico licenses this specialty through the Construction Industries Division (CID) as GS-4, Concrete, cement, walkways and driveways. The classification covers mixing, pouring, placing, and finishing concrete, including excavation, form work, and reinforcement placement. It also covers curbs, gutters, sidewalks, and driveway culverts on private property. The rule expressly excludes performing that work in public rights-of-way; a contractor should obtain a CID classification determination before bidding work that may fall outside GS-4.
Regulatory Body
Authority over this credential rests with New Mexico Regulation and Licensing Department — Construction Industries Division (CID), which issues and polices it under NMSA 1978 Chapter 60 Article 13 (Construction Industries Licensing Act); NMAC Title 14 Chapter 6. CID licenses construction contractors and tradespeople statewide through its General Construction Bureau, Electrical Bureau, and Mechanical Bureau, enforces adopted building, electrical, plumbing, and mechanical codes, and conducts inspections and disciplinary proceedings.
- Official portal: https://www.rld.nm.gov/construction/
- Address: 2550 Cerrillos Road, Santa Fe, NM 87505
- Phone: (505) 476-4700
Eligibility Requirements
Applicants must be at least 18 years old. Applicants must provide a Social Security Number. The reviewed CID rule and application do not state a general New Mexico-residency condition. CID licenses qualified business entities that employ or are owned by a qualifying party certified for the requested classification; the company must provide the required New Mexico tax registration and, when applicable, Secretary of State registration.
Good moral character
The CID application requires disclosures about prior licensing, scope, judgments, complaints, discipline, and disqualifying felonies. CID may hold or deny an application on the grounds stated in its rules and application instructions.
Background investigation
The reviewed CID/PSI materials require application disclosures but do not establish a universal fingerprint-background-check requirement for GS-4.
Experience and Education
The experience bar is Two years of practical concrete-trade experience, including one year at foreman level, for the GS-4 scope. CID says required experience must be within the 10 years immediately before application., and it must be backed by verifiable records — typically payroll, tax, project, or supervisor documentation covering the claimed period.
Accepted proof of experience or eligibility
- Qualifying Party Certificate Application submitted to PSI
- General Building Work Verification Form / work-experience affidavit completed by each person attesting to the experience
Education substitution
CID may credit qualifying technical training at one-half year of experience for each year of training, but training may not exceed one-half of the applicable work-experience requirement.
Exam Requirements
The exam, administered by PSI for New Mexico CID, breaks into the parts shown below — all must be passed before licensure:
- New Mexico Business and Law Examination (or an approved Business and Law course) — 50 questions, 130 minutes , passing score 75%
- GS-4 Concrete, Cement, Walkways, and Driveways trade examination — 60 questions, 150 minutes , passing score 75%
Examination fee: $68.88 for each of the Business and Law and GS-4 trade exams ($137.76 if taking both examinations).
Retake policy: CID/PSI preapproval is required. A candidate must test within six months after eligibility; for GS-4, no more than two attempts may occur in 30 days, and after two failures in that period the candidate must wait 30 days from the first attempt. Passing scores are valid for one year.
Insurance and Bonds
A $10,000 surety bond, in the form prescribed by the CID, must be posted as a condition of licensure.
General liability
The reviewed CID contractor materials do not state a universal GS-4 general-liability minimum. A project owner, contract, permit authority, or other program may impose separate coverage requirements.
Workers' compensation
Workers’ compensation coverage is required for CID licensees; the CID application notes that a sole proprietor with no employees may be exempt from workers’ compensation insurance requirements.
Additional financial requirements
The reviewed CID application requires a $10,000 code bond and specified entity, tax-registration, qualifying-party, and examination documents; it does not state a GS-4 financial-statement or bid-limit requirement.
Fee Schedule
| Fee | Amount |
|---|---|
| Application (non-refundable) | $66 |
| Examination | $137.76 |
| Initial license | $156 |
| Renewal (every 3 years) | $186 |
To turn these board fees into a realistic year-one budget — bond premium, liability insurance, and exam prep included — open the cost calculator preloaded for New Mexico concrete contractor.
Renewal and Continuing Education
The New Mexico GS-4 Concrete, Cement, Walkways and Driveways — CID must be renewed every 3 years. The fee to renew is presently $186. Licenses expire every three years on the last day of the month of issue. Renewal materials require the applicable fee, notarized renewal form with qualifying-party signatures, and a new bond or continuation certificate that covers the complete three-year renewal term. No GS-4 continuing-education requirement was identified in the reviewed contractor renewal materials.
Reciprocity
New Mexico grants no NASCLA reciprocity for this classification.
| Reciprocal State | Accepted Exam | Conditions |
|---|---|---|
| No formal bilateral reciprocity agreements identified. | ||
The reviewed CID rule, application materials, and PSI bulletin do not identify a reciprocal GS-4 concrete credential. Obtain written CID/PSI guidance before relying on an out-of-state license or examination.
Weighing more than one jurisdiction? The national hub compares Concrete Contractor license requirements in every state — exam, bond, fee, and experience thresholds side by side.
Concrete Contractor Licensing in Neighboring States
Contractors working near a state line, or weighing where to qualify first, should compare New Mexico's requirements against the bordering jurisdictions before committing to an application:
- Arizona Concrete Contractor License Requirements — Arizona Concrete Contractor License — Arizona Registrar of Contractors (C-9 / R-9 / CR-9)
- Colorado Concrete Contractor License Requirements — Colorado Concrete Contractor — No Standalone State Concrete License
- Oklahoma Concrete Contractor License Requirements — Oklahoma Concrete Contractor — Local Licensing Framework
- Texas Concrete Contractor License Requirements — Texas Concrete Contractor — Local Licensing Framework
- Utah Concrete Contractor License Requirements — Utah S260 Asphalt & Concrete Contractor — Division of Professional Licensing
Step-by-Step Application Roadmap
- Match the work to a CID classification. Use GS-4 only for its stated scope. Its private-property limitation excludes the listed concrete work in public rights-of-way; request a classification determination if the job is unclear.
- Establish the qualifying party’s experience. Document two years of practical GS-4 trade experience, including one year at foreman level, through the PSI/CID work-verification process.
- Obtain PSI/CID examination approval. Submit the Qualifying Party Certificate Application and experience affidavits to PSI. CID or its designee reviews the experience before testing can be scheduled.
- Complete the Business and Law requirement and GS-4 exam. Pass both PSI examinations or complete an approved Business and Law course, as CID permits, then retain the score documentation.
- Prepare the business-license packet. Submit the contractor application, qualifying-party documentation, $10,000 code bond, current New Mexico tax registration, entity registration when applicable, and fees to PSI.
- Maintain the three-year license. Renew before expiration with the required renewal form, signatures, fee, and a new bond or continuation certificate covering the entire renewal term.
Application Checklist
Before submitting to CID, the applicant should have each of the following ready:
Progress is saved in this browser, so you can return to this checklist while your application is in flight.
Common Filing Mistakes
The following pitfalls summarize the issues most likely to delay, return, or derail a New Mexico Concrete Contractor application based on the published board instructions and source materials cited on this page.
Treating GS-4 as authority for public-right-of-way work
GS-4 includes certain concrete items only when installed on private property and says it may not perform that work in public rights-of-way.
Scheduling before experience approval
CID/PSI requires qualifying-party experience approval before an applicant can schedule the examination.
Missing the foreman-level portion of the experience requirement
GS-4 requires one of its two practical-experience years at foreman level; have each verifier describe the work accurately.
Submitting an incomplete business packet
CID/PSI lists the bond, tax registration, qualifying-party documentation, applicable scores or course certificate, and entity documents where applicable. Incomplete packets are returned.
Allowing the bond or renewal to lapse
The bond must cover the complete initial or renewal term. A missed renewal suspends the license, and a license not renewed within 90 days is cancelled.
Study and Reference Materials
These materials are drawn from the regulator's own citations and the references applicants commonly use to prepare. CLR receives no compensation for listing them.
- New Mexico Contractor Candidate Information Bulletin — PSI for New Mexico CID. Use the current bulletin for the GS-4 outline, approved references, open-book rules, fees, and testing procedures.
- 14.6.6 NMAC — Classifications and Scopes — New Mexico State Records Center and Archives. Review the GS-4 scope before accepting work, particularly the public-right-of-way exclusion.
- CID application and qualifying-party forms — PSI / New Mexico CID. Use current forms and instructions for the experience affidavit, application documents, bond, and renewal packet.
Other New Mexico Trade Licenses
CLR maintains guides for additional New Mexico trades; the published ones are listed here:
- New Mexico General Contractor License Requirements
- New Mexico Electrician License Requirements
- New Mexico Plumber License Requirements
- New Mexico HVAC Technician License Requirements
- New Mexico Roofing Contractor License Requirements
- New Mexico Painting Contractor License Requirements
- New Mexico Landscaping Contractor License Requirements
- New Mexico Masonry Contractor License Requirements
- New Mexico Carpentry Contractor License Requirements
- New Mexico Solar Installer License Requirements
- New Mexico Low-Voltage Technician License Requirements
- New Mexico Fire Sprinkler Contractor License Requirements
- New Mexico Home Inspector License Requirements
- New Mexico Pool Contractor License Requirements
- New Mexico Handyman License Requirements
- New Mexico Pest Control License Requirements
Frequently Asked Questions
Does New Mexico have a dedicated concrete contractor classification?
Yes. CID lists GS-4, Concrete, cement, walkways and driveways, as a general-construction specialty classification.
What work does GS-4 authorize?
GS-4 covers mixing, pouring, placing, and finishing concrete, including excavation, form work, and reinforcement placement. It includes specified curbs, gutters, sidewalks, and driveway culverts on private property.
Can a GS-4 contractor perform concrete work in a public right-of-way?
No. The GS-4 scope says the classification may not perform that work in public rights-of-way. CID’s classification-determination process is the appropriate route when a project boundary or scope is uncertain.
How much GS-4 experience does the qualifying party need?
The classification requires two years of practical trade experience, one year at foreman level. CID’s application guidance says the required experience must be within the 10 years immediately before application.
How often does a New Mexico contractor license renew?
A contractor license expires every three years on the last day of the month in which it was issued. The renewal packet must include the required signatures, fee, and bond continuation or new bond for the entire renewal term.
Primary Sources
Regulatory requirements on this page are drawn from the official board, statute, and exam-provider materials listed below.
- New Mexico Administrative Code — 14.6.6 classifications and scopes
- NM RLD — Apply for a Construction Industries license
- New Mexico Contractor Candidate Information Bulletin — PSI
- New Mexico contractor licensing fees — PSI
- New Mexico contractor license application (May 2025) — PSI
- New Mexico contractor license renewal instructions (June 2025) — PSI
- NM RLD — Construction Industries Division
- NMSA 1978 Chapter 60 Article 13 — Construction Industries Licensing Act
- NMAC Title 14 Chapter 6 — Construction Industries General Provisions
- PSI test-taker program directory — search for New Mexico contractor examinations
Verified 2026-09-08 · Next scheduled review 2026-12-07
Report a correction to this guide
Corrections and presentation updates
- : Shared template updated to distinguish unspecified eligibility requirements, retain cost qualifications, and use consistent headings. Source-check dates are unchanged by presentation updates.