Washington Solar License Requirements (2026)

Gabriel Giner

By Gabriel Giner, Editor · Verified  ·  Updated

Washington does not issue a stand-alone solar contractor license. A business installing photovoltaic electrical equipment must hold an L&I electrical contractor license in a classification that actually covers the work, have an assigned electrical administrator or master electrician, and use properly certified electricians. The general electrical classification is 01; the former “06A” and “06B” labels are HVAC/refrigeration specialties, not solar classifications. A solar company that also contracts for roof, structural, or other non-electrical construction can need separate Washington contractor registration under RCW 18.27. L&I or an authorized city handles the electrical permit and inspection, while the local building authority separately decides structural/building permits and review.

Who Issues the Washington Solar License?

Washington regulates solar work through the scope-specific and local rules described below under RCW Chapter 19.28; WAC Chapter 296-46B; RCW Chapter 18.27; whether a credential applies depends on the work scope and conditions explained there. L&I licenses electrical contractors and certifies electrical personnel statewide. L&I or an authorized city issues electrical permits and conducts inspections; separate construction-contractor registration can apply to non-electrical solar scope.

  • Official portal: lni.wa.gov
  • Address: Electrical Program, P.O. Box 44460, Olympia, WA 98504-4460
  • Phone: (360) 902-5269

Washington Solar License Eligibility Requirements

Applicants must be at least 18 years old. Applicants must provide a Social Security Number. The electrical-contractor requirements are based on the firm, UBI, assigned administrator/master, bond, and required account information; L&I does not list a Washington-residency condition.

Good moral character

L&I can deny or act on an electrical license for statutory and rule-based grounds, including outstanding judgments and compliance failures. Use the current application and RCW/WAC materials rather than assuming a solar-specific character rule.

Background investigation

The electrical contractor application requires identifying information for firm members. L&I does not list a criminal background check for every solar role.

How Much Experience Do You Need for a Washington Solar License?

An electrical contractor must designate a valid master journey-level electrician, master specialty electrician in the applicable specialty, or electrical administrator. An administrator certificate is obtained by passing the appropriate examination; L&I’s current rule says there are no qualification requirements merely to sit for that administrator examination. This is different from the separate experience path for journey-level or master electrician certification.

Accepted proof of experience or eligibility

  • Electrical contractor license application, UBI, and $4,000 bond or permitted savings-account assignment
  • Assigned administrator/master form and current certificate information
  • Electrical permit and inspection records for each electrical installation
  • Contractor-registration materials if the business also contracts for non-electrical construction scope

Education substitution

Do not represent a generic 8,000-hour master-electrician path as a prerequisite for every solar contractor. The firm may use an appropriately scoped administrator or master certificate; electrician certification and trainee supervision rules remain separate.

Washington Solar Exam Requirements

Testing provider or authority: L&I uses a state-authorized testing contractor for normal electrical administrator and electrician examinations. Examinations for the pathways described in this guide:

  • Appropriate electrical administrator examination, if the firm is qualifying through an administrator rather than an already-valid master certificate — passing score 70%

Where not shown above, the question counts and time limits are not published in the sources cited here; they appear in the current candidate information bulletin, which applicants should read before scheduling.

Examination fee: As of July 1, 2026, the rule lists a $44.20 administrator examination application only for department-administered testing; normal testing fees are set by L&I contract. A department-administered first administrator/master examination is $106.70. The electrical contractor license is $353.90 for a 24-month initial/mail/in-person application or renewal, and $306.20 for a fully online renewal.

Retake policy: Under L&I’s electrical examination rules, an administrator candidate’s one-year exam period begins on the date of the first attempt, each section requires 70% or higher, and you must wait at least 14 days between attempts (90 days between attempts after three failures within a one-year exam period).

Washington Solar Insurance and Bond Requirements

The L&I Electrical / Local AHJ requires a $4,000 license surety bond, on its prescribed form, before it issues the Washington solar license.

General liability

L&I says electrical contractors are encouraged to carry general liability insurance but that it does not keep liability-insurance records for electrical contractors. The electrical-contractor statute instead requires insurance or other financial responsibility of $20,000 property damage, $50,000 injury/death to one person, and $100,000 injury/death to more than one person; an L&I-approved assigned account is an alternative.

Workers' compensation

An electrical-contractor applicant provides an industrial-insurance account number and needs a workers’ compensation account when the business hires employees. Review the business’s actual workforce and any out-of-state coverage with L&I.

Additional financial requirements

No financial statement is identified for the electrical contractor license. The application requires an original $4,000 electrical/telecommunications contractor surety bond or an allowed savings-account assignment. Non-electrical construction registration has separate bond and insurance requirements.

How Much Does a Washington Solar License Cost?

FeeAmount
Application$354
Initial license$354
Renewal (every 2 years)$306

To turn these board fees into a realistic year-one budget — bond premium, liability insurance, and exam prep included — open the cost calculator preloaded for Washington solar.

Washington Solar License Renewal and Continuing Education

The Washington solar license renews every 2 years. The renewal fee is $306. Keep the bond, assigned administrator/master, and any required account information active. L&I can suspend the electrical contractor license if minimum requirements are not maintained. The displayed renewal fee is the current fully online amount; mail/in-person renewal is $353.90.

Continuing education: The electrical contractor license itself has a two-year term. The assigned administrator or master certificate has a separate three-year renewal cycle and requires 24 L&I-approved hours, including at least eight code-update hours and four RCW/WAC-review hours.

Downloadable Asset

2026 Washington Solar License Roadmap (PDF) — a printable step-by-step checklist for the application process.

Download the PDF roadmap →

Does Washington Accept Out-of-State Solar Licenses?

Washington does not accept the NASCLA Accredited Examination for the Washington solar license.

Reciprocal StateAccepted ExamConditions
No formal bilateral reciprocity agreements identified.

Washington has no published solar-contractor reciprocity agreement. Verify any electrician certificate reciprocity or credential recognition directly with L&I before relying on it; the firm still must meet Washington electrical-contractor and permit rules.

Weighing more than one jurisdiction? The national hub compares published Solar license requirements by state — exam, bond, fee, and experience thresholds side by side.

How to Get a Washington Solar License, Step by Step

  1. Map electrical and non-electrical scopes. Separate PV electrical installation from roof, structural, general-construction, plumbing/thermal, utility, and local-building work. Determine whether contractor registration is also needed for the non-electrical contract.
  2. Choose a valid electrical-contractor classification. Use a classification that covers the work—01 General Electrical covers all phases. Do not use HVAC/refrigeration 06A or 06B as a solar classification.
  3. Assign an administrator or master electrician. The firm must designate a valid appropriately scoped electrical administrator, master journey-level electrician, or master specialty electrician. The designee must be a firm member or full-time supervisory employee under the current WAC.
  4. File the electrical contractor requirements. Obtain a UBI, submit the electrical contractor application, file the $4,000 bond or permitted savings assignment, and provide required industrial-insurance account information.
  5. Staff the electrical work correctly. All electrical work must be performed by properly certified electricians or trainees under the applicable supervision rules. An administrator assignment does not authorize uncredentialed field work.
  6. Register as a construction contractor when non-electrical scope requires it. L&I expressly notes that an electrical business doing other, non-electrical work may also need contractor registration. That registration has separate $15,000 specialty/$30,000 general bond and liability-insurance rules.
  7. Obtain electrical and building approvals. The installing electrical contractor purchases the electrical permit. L&I or an authorized city handles inspection; the local building authority decides structural/building permit, plan-review, and roof requirements.
  8. Complete inspection and utility interconnection. Request electrical inspection within three business days after completion or one business day after energization, whichever occurs first, and follow the serving utility’s current interconnection process.

Application Checklist

Have each of these ready before you file with the L&I Electrical / Local AHJ:

Common Filing Mistakes

These are the problems most likely to delay or derail a Washington Solar application, drawn from the instructions of the L&I Electrical / Local AHJ and the other sources cited on this page.

Using an HVAC specialty as a solar license

06A and 06B are HVAC/refrigeration specialties. Select a classification that covers PV electrical work and verify exact scope before bidding.

Equating the administrator with field-electrical certification

The assigned administrator/master is a business requirement. Electrical work must still be performed by properly certified electricians or appropriately supervised trainees.

Forgetting the non-electrical contractor-registration layer

An electrical contractor performing roof, structural, or other non-electrical construction may also need construction contractor registration.

Treating electrical and building permits as one approval

L&I or an authorized city handles electrical permits and inspections; the local building authority controls structural/building approval.

Using the old annual fee and insurance figures

Electrical contractor licenses are now two-year licenses. Use current L&I fee and financial-responsibility rules rather than obsolete annual solar estimates.

Study and Reference Materials

These references are cited in the Washington sources for this guide or commonly used to prepare for solar work; CLR receives no compensation for listing them.

  • Washington electrical contractor licensing — Washington L&I Electrical Program. Current business-license requirements, assigned administrator/master, two-year renewal, and processing information.
  • WAC Chapter 296-46B — Washington L&I / Code Reviser. Current electrical licensing, PV, permit, inspection, designee, and certification rules.
  • RCW Chapter 19.28 — Washington Legislature. Statutory electrical contractor, bond, financial-responsibility, permit, and administrator framework.

Solar Pay and Employment in Washington

The U.S. Bureau of Labor Statistics estimates that solar photovoltaic installers work in Washington, earning a median of $61,630 a year ($29.63 an hour). That is 16% above the national median of $53,140, ranking 6th of 32 jurisdictions BLS published. The lowest-paid 10% earn under $50,440 and the top 10% earn over $61,640.

Solar Photovoltaic Installers wages, Washington compared with the United States, May 2025
MeasureWashingtonUnited States
Median annual wage$61,630$53,140
Median hourly wage$29.63$25.55
10th–90th percentile$50,440–$61,640$41,600–$79,970
Employment—31,350

Source: BLS Occupational Employment and Wage Statistics, May 2025, occupation 47-2231 (Solar Photovoltaic Installers). Figures cover wage and salary employees and exclude self-employed owners.

Frequently Asked Questions

Does Washington have a solar contractor license?

No stand-alone solar credential was identified. PV electrical work requires the appropriate L&I electrical contractor license and properly certified electrical personnel; non-electrical construction scope may also require contractor registration.

Can a 06A or 06B contractor install solar?

Those are HVAC/refrigeration specialties, not solar classifications. The firm must hold the electrical-contractor classification that covers the actual PV electrical work; 01 General Electrical covers all phases.

Does every solar company need a Master Electrician?

The firm must assign a valid master journey-level electrician, appropriately scoped master specialty electrician, or electrical administrator. The statute permits any of those routes, so a master is not the only option.

Does L&I require $250,000/$200,000 liability insurance for an electrical contractor?

No. L&I says it does not keep general-liability records for electrical contractors. RCW 19.28.501 requires the stated insurance/financial-responsibility amounts, and an approved assigned account can be used instead.

Are solar electrical permits local or state permits?

Electrical permits and inspections are issued by L&I or an authorized city. Building and structural permits are local-AHJ matters. The electrical contractor buys the electrical permit for work it performs.

Primary Sources

Regulatory requirements on this page are drawn from the official board, statute, and exam-provider materials listed below.

  1. Washington L&I — electrical contractor licensing
  2. RCW 19.28.041 — electrical contractor license, bond, and assigned administrator/master
  3. RCW 19.28.501 — electrical contractor insurance/financial responsibility
  4. WAC 296-46B — electrical licensing, photovoltaic, permits, and inspection rules
  5. WAC 296-46B-909 — current electrical contractor and administrator fees
  6. Washington L&I — electrical permits and inspections
  7. Washington L&I — contractor registration
  8. RCW 18.27 — construction contractor registration

Verified 2026-09-04  · Next scheduled review 2026-12-03

Report a correction to this guide

Corrections and updates

No factual corrections have been recorded for this guide.

Layout changes shared by every guide are listed in the template change log; they do not change source-check dates.

Solar Licensing in Neighboring States

Contractors working near a state line, or weighing where to qualify first, should compare Washington's requirements against the bordering jurisdictions before committing to an application:

Washington solar requirements compared with neighboring states
StateStatewide ruleExamExperienceLicense bondState fees
WashingtonDepends on scopeRequired—$4,000$708+
IdahoState licenseRequired2 yr—$140+
OregonState licenseRequired2 yr$20,000$860